Skip to Content

CNC Machining and Precision Manufacturing Solutions

From prototype to production, we help you source and manufacture precision-machined components with vetted factories, tight tolerances, and scalable capacity.

Expert Machining Services

Submit a free sourcing request

30-minute call with our team

Why teams pick Importivity for metal & CNC

Tight tolerances, on time.

We pair parts to shops that already run your spec.

Real QA, real deadlines.

First articles (the first parts made) approved, pre-ship inspections included.

Transparent landed costs.

China, Vietnam, and Mexico side by side in 48 hours.

One accountable team.

U.S. project leads plus on-site QC (quality checks). No hand-offs, no mystery.

Ready to get started?

Get matched with vetted factories and a transparent, tariff-aware cost plan.

Talk to a Sourcing Expert

What to send with your RFQ (request for quote)

To get you an accurate, apples-to-apples quote fast, include your drawings (PDF + STEP/IGES) with tolerances and finish notes, plus any critical features (gauge, alloy, hardness, weld specs). If you have them, share a target price and demand forecast (MOQ/EAU: smallest order size and estimated yearly units) so we can pair you with the right-capability plant. Note any packaging/labeling requirements, as well as the QA documents you need (FAI/PPAP/CMM inspection and approval reports). Finally, add your ship-to ZIP, and we'll return a 48-hour landed-cost model and a vetted factory shortlist.

Explore How It Works
What to send with your RFQ (request for quote)

Our Sourcing Process

Fast, transparent, and tariff-aware; we align on specs, surface the right factories, and move you from DFM (design for manufacturing review) to production without surprises.

01

Part & Intent Review (Day 0–1)

We digest your prints, target price, demand, and risks.

02

Factory Shortlist (About 48 Hours)

2-3 shops that already run similar parts.

03

DFM & Quote Pack (Day 2–5)

Feedback, risks, firm lead times, landed cost by shipping route.

04

First Articles (Weeks 2–4)

Tooling/fixtures, sample run, FAIR/CMM as needed.

05

Production (Ongoing)

In-process QA, pre-ship inspections, photo/video proof.

06

Scale & Dual-Source

Lock in capacity; add a backup plant if needed.

Compare Regions for CNC Parts

Transparent cost, duty, lead time, and risk across China, Vietnam, Mexico, and the US, so your first articles pass and production holds spec.

China

  • Deepest bench for complex CNC plus finishes (anodize, e-coat, zinc, passivation)
  • Scale pricing for multi-op parts and assemblies
  • Mature supply chains and tooling; fast fixture iteration

Vietnam

  • Excellent sheet metal and assembly value; CNC capability improving quickly
  • Avoids the China Section 301 lists, but Section 232 (a US tariff on imported metals) still applies to most metal parts
  • Great for enclosures, brackets, and light fab with paint/powder

Mexico

  • Nearshore speed and easier on-site visits (same/similar time zones)
  • Strong for heavier-gauge fab, frames, weldments, and final assembly
  • Truck lanes cut transit time; lower inventory risk vs ocean

United States

  • Best for urgent prototypes, regulated parts, and IP-sensitive builds
  • Shortest lead times and easiest change control with local teams
  • Ideal for low-volume/high-mix or tight DFM collaboration

What Drives the Cost of a Machined Part

Four things to check before you compare quotes.

01

Setup and programming

Programming, fixtures and first-article inspection are one-time costs. On a run of 50 parts they can outweigh cutting time, so ask for setup and unit price as separate lines.

02

Tolerances

Tight tolerances mean slower cuts, extra passes and more inspection. Put them only on features that need them, and use a general tolerance everywhere else.

03

Material and finish

Alloy, stock size and each added operation change the price. Anodizing and plating often go to an outside shop, which adds time and another place for parts to be damaged.

04

Duty on metal parts

Parts in HTS (tariff code) chapters 73 and 76 are covered by Section 232, at 50% or 25% of full customs value. Others depend on the annex and a 15% metal weight test. USMCA does not remove it, and parts from China may also pay Section 301. Keep mill certificates showing where the metal was melted or smelted.

What to Include in Your RFQ

Send these along and we'll return a 48-hour landed-cost model and a vetted factory shortlist.

  • Drawings (PDF + STEP/IGES), tolerances & finish notes
  • Target price (if you have one), demand forecast (MOQ/EAU)
  • Critical features, gauge & alloy, hardness, weld specs
  • Packaging/labeling, QA docs needed (FAI/PPAP/CMM), ship-to ZIP
Case Studies

Real results from the founder-led brands we've helped source, scale, and ship.

Global Sourcing Locations

We connect businesses to vetted manufacturers in the world's most important supply-chain hubs. Each region has unique strengths, and we help you navigate them.

View All Sourcing Countries

Frequently Asked Questions

We only quote plants that already run your tolerance band. First articles include FAIR/CMM on criticals when required. If a shop can't hold spec during FA, we don't award production... full stop.
PPAP (up to Level 3), FAIR/ISIR, CMM reports, certs of conformance, material and finish certs, control plans, and inspection photos/videos. We align docs to your PO before kickoff.
We do capability checks (machine list, gauge R&R, sample precedent), DFM review, and, if needed, trial cuts or a pilot panel. No greenlight without a credible path to spec.
We raise an NCR, perform root cause + corrective action, and rework or remake at supplier cost. You get the NCR log, photos, and re-inspection data before release.
Yes. We define FAI scope up front (forms, sampling plan, ballooned prints) and deliver FAI/PPAP with the first-article lot.
For criticals, yes. We set in-process sampling, collect SPC data (Cp/Cpk goals, typically at or above 1.33 on CTQs), and include the charts in the lot packet.
It depends on the part and the duty on it. China has the widest range of shops, but metal parts from China can pay both Section 232 and Section 301. Vietnam and Mexico avoid the China Section 301 lists, and US parts pay no import duty. Compare landed cost on your own drawing and volume.
Pick an Open Slot Below

Book a free 30-minute call with our sourcing team, no commitment required. We'll review your product, work out your full cost to your door with tariffs included, and show you which vetted factories fit your specs and budget.

Loading the calendar